งานบริการและซ่อมบำรุง Distribution transformer
INSTALLATION AND FUNCTION TEST.
RETROFITTING AND REPLACEMENT.
PREVENTIVE MAINTENANCE.
RETROFITTING AND REPLACEMENT.
PREVENTIVE MAINTENANCE.
Scope of work.
1. Transformer Oil Type.
Inspection
- General condition check.
- Body and seal check.
- Termination and mounting check.
- Bushing condition check.
- Grounding connection check.
- Tap terminal check.
- Oil level check.
- Leakage inspection.
- Drier filter check.
Testing
- Insulation resistance test.
- Protection test.
- Dielectric strength of oil test (IEC 156).
- Buchholz / temp function test.
- Winding resistance test
Option: (Shall be charged on base unit price.)
- Single phase short circuit impedance
- Turn ration test
- Insulation power factor
- DC. Resistance test.
- Oil test (DGA test)
- Oil test (Moisture content test)
Improvement / Treatment
- Cooling system treatment.
- Body and seal cleaning.
- Bushing and insulator post cleaning.
- Re-tightening with torque wrench (Busing connection).
Test report and Comments
- By T Arrow
2. Transformer (Dry type & Cast Resin type)
Inspection
- General condition check.
- Body and seal check.
- Termination and mounting check.
- Bushing condition check.
- Grounding connection check.
- Tap terminal check.
Testing
- Insulation resistance test.
- Protection test.
- Cooling system condition and function test. (Fan, alarm, tripping)
- Winding resistance test.
Improvement / Treatment
- Cooling system treatment.
- Body and seal cleaning.
- Bushing and insulator post cleaning.
- Re-tightening with torque wrench. (Busing connection).
Test report and Comments
- By T Arrow
รับเหมางานระบบไฟฟ้า
เครื่องกล สื่อสาร
เครื่องกล สื่อสาร
ออกแบบติดตั้งระบบไฟฟ้า
แรงสูง แรงต่ำ
แรงสูง แรงต่ำ
ขออนุญาตขยายเขตระบบ
จำหน่ายไฟฟ้า MEA, PEA
จำหน่ายไฟฟ้า MEA, PEA
ออกแบบติดตั้งระบบล่อฟ้า
และ solar cells
และ solar cells
ออกแบบติดตั้งระบบไฟฟ้า
แสงสว่างและไฟ
แสงสว่างและไฟ
บำรุงรักษาเชิงป้องกัน (PM.)
ตัวอย่าง ผลงานของเรา